A panelboard may contain a main breaker and still require the neutral to remain isolated from ground. A main-lug-only panel may also be used in more than one system position.
The presence of a main breaker does not, by itself, determine whether neutral and ground should be bonded.
The correct arrangement depends on questions such as:
In a typical grounded low-voltage system, neutral and ground are connected at one defined system bonding point. Downstream of that point, the neutral normally remains isolated from the equipment enclosure and equipment-grounding system.
This separation is not simply a drafting preference. It prevents normal neutral current from flowing through metal enclosures, raceways, equipment-grounding conductors and other bonded conductive paths.
The applicable edition of NFPA 70, the National Electrical Code, manufacturer instructions, product listings, project specifications and authority-having-jurisdiction requirements must control the final installation.
The words “neutral,” “ground” and “bond” are often used interchangeably in informal discussions. They have different electrical functions.
| Item | Primary function | Carries current during normal operation? |
|---|---|---|
| Neutral conductor | Returns current from line-to-neutral loads to the source | Yes |
| Equipment grounding conductor | Provides an effective ground-fault current path | Normally no |
| Grounding electrode conductor | Connects the grounded system or equipment to the grounding electrode system | Normally no |
| Bonding connection | Electrically joins conductive parts to establish continuity and a fault-current path | Not intended as a normal load path |
Understanding these differences is essential when specifying, manufacturing or inspecting a panelboard.
The neutral is a grounded circuit conductor. In a grounded single-phase or three-phase system, it can carry current during normal operation.
Examples include:
In a balanced three-phase system, some phase currents may cancel at the neutral point. However, the neutral should not be assumed to carry zero current.
Actual neutral current can be affected by:
Because the neutral is a normal current-carrying conductor, its bar, terminals and conductor connections must be selected for the actual electrical application.
The equipment grounding conductor connects non-current-carrying metal parts into the equipment-grounding and bonding system.
These parts can include:
During normal operation, the equipment grounding conductor should not function as a parallel return path for load current.
Its essential role appears during a ground fault. If an ungrounded conductor contacts a bonded metal enclosure, the equipment grounding and bonding path carries fault current back toward the source. Sufficient fault current allows the applicable fuse or circuit breaker to operate.
A connection to earth alone does not perform the same function as an effective equipment-grounding and bonding path. Ground rods and other grounding electrodes serve important purposes, but they are not a substitute for the required equipment grounding conductor in a feeder.
Bonding creates electrical continuity between conductive parts.
Examples may include bonding:
Grounding and bonding are related but are not identical. NFPA explains that grounding connects a system or conductive object to earth, while bonding joins conductive parts to establish electrical continuity and conductivity.
A useful way to distinguish the terms is:
The correct bonding point depends on the source and system configuration.
For a typical utility-supplied grounded system, the service bonding arrangement is established at the service equipment in accordance with the applicable NEC requirements. Downstream panelboards normally keep the neutral isolated from equipment ground.
The system should not be designed by applying the rule “bond in the main panel” without first defining what “main panel” means.
A facility may contain several devices described informally as main panels:
Only the equipment’s actual position and function in the electrical system can establish the appropriate bonding arrangement.
At service equipment for a typical grounded system, the grounded conductor is connected to the equipment-grounding and bonding system through the applicable service bonding arrangement.
Depending on the approved equipment construction, this may involve:
This connection provides a low-impedance path for ground-fault current to return to the grounded service conductor and source.
The exact hardware must be approved for the equipment. A random screw, field-made jumper or mounting bolt should not be used as a substitute for the manufacturer’s bonding provision.
Manufacturer instructions may supply a green bonding screw with a convertible load center. The presence of that screw does not mean it should always be installed. It is installed only when the equipment’s application requires the neutral to be bonded to the enclosure.
A downstream panelboard is supplied from an upstream disconnect or overcurrent protective device.
Its typical arrangement includes:
The neutral bar must remain isolated from:
The ground bar, by contrast, is normally bonded to the panel enclosure using the approved mounting location and hardware.
This creates two distinct paths:
No.
A panelboard with a main breaker may be installed downstream from service equipment. In that application, the main breaker provides local disconnecting and overcurrent protection, but the neutral normally remains isolated.
A main-lug-only panelboard may also be supplied from upstream protection and used as downstream equipment.
Therefore, the following assumptions are unreliable:
The project one-line diagram should identify the service point, source, disconnect locations and bonding point. The panel schedule and manufacturing drawings should then show whether the neutral assembly is bonded or isolated.
“Subpanel” is a commonly used industry term for a panelboard installed downstream from another disconnecting or overcurrent protective device. The exact NEC and product terminology may vary, but the electrical concern is the same: a downstream neutral-to-ground connection can create parallel current paths.
Assume a downstream panel contains a neutral bar bonded to the enclosure and a ground bar also bonded to the enclosure.
The feeder neutral and equipment grounding conductor are already connected together at the permitted upstream bonding point. The downstream bond connects them again.
Normal neutral current can then divide between multiple return paths:
The amount of current on each path depends on its impedance. The current does not remain confined to the insulated neutral conductor merely because that conductor is present.
Objectionable current is current flowing on grounding and bonding paths under conditions where those paths are not intended to carry normal load current.
An improper downstream neutral-to-ground bond can place normal operating current on:
This condition can complicate troubleshooting and affect the intended operation of the grounding and bonding system.
Potential consequences include:
The issue is not that every bonded enclosure will immediately become dangerously energized. The problem is that normal load current has been allowed onto paths reserved for grounding, bonding and fault clearing.
Usually not.
An improper neutral-to-ground bond does not necessarily create a short circuit. Both conductors are already connected at the permitted system bonding point. The additional downstream connection creates parallel current paths rather than a conventional line-to-ground fault.
As a result:
A working panel is not proof of a correct bonding arrangement.
The condition is often discovered during:
No.
Neutral isolation and enclosure bonding are separate requirements.
In a typical downstream metal panelboard:
The enclosure remains effectively bonded to the equipment-grounding system even though the neutral is isolated.
The objective is not to isolate the panel enclosure from ground. It is to prevent the enclosure and equipment-grounding system from becoming a normal neutral-current path.
A typical 120/240 V single-phase arrangement can be summarized as follows:
| System position | Neutral bar | Ground bar or enclosure | Neutral-to-ground bond |
|---|---|---|---|
| Service equipment | Connected according to the approved service bonding arrangement | Bonded | At the permitted service bonding point |
| Downstream main-breaker panel | Isolated | Bonded to equipment grounding conductor | No downstream bond |
| Downstream main-lug-only panel | Isolated | Bonded to equipment grounding conductor | No downstream bond |
| Branch-circuit equipment | Neutral and equipment ground remain separate where applicable | Exposed metal parts bonded | No new neutral-to-ground bond |
This is a general arrangement for a common grounded system. Transformers, generators, transfer switches, separately derived systems, separately supplied buildings and special grounding systems require additional evaluation.
A downstream panelboard must receive all conductors required by the system and its connected loads.
For a typical 120/240 V single-phase panelboard serving both 120 V and 240 V loads, the feeder normally includes:
The neutral carries current from line-to-neutral loads. The equipment grounding conductor connects the downstream enclosure and equipment-grounding bar to the upstream grounding and bonding system.
For a three-phase, four-wire panelboard, the feeder normally includes:
The term “four-wire system” usually describes the three phase conductors and neutral. It does not mean the equipment grounding conductor can be omitted.
If the downstream panel serves only line-to-line loads and no neutral is required, the project may use a configuration without a neutral conductor. However, the equipment grounding conductor and enclosure-bonding arrangement are still required.
The feeder configuration should be based on the actual electrical system, not only the number of breakers or panelboard spaces.
No.
The equipment grounding conductor should not be used as the return path for normal line-to-neutral load current.
Using it as a neutral can place normal current on:
A load requiring a neutral must be supplied by a properly sized grounded circuit conductor connected to the system neutral.
Not in a typical new downstream feeder installation.
If the downstream neutral is bonded to the panel enclosure and used to provide the equipment-grounding path, normal neutral current can flow on the enclosure and connected metal systems.
The normal new-installation arrangement is:
Legacy installations may have been permitted under earlier rules and specific conditions. Their existence should not be used as the design basis for a new panelboard project.
The neutral bar in a downstream panelboard must remain electrically isolated from the metal enclosure and equipment-grounding system.
The isolation method depends on the listed panel construction. It may include:
The neutral bar and its insulation must remain suitable for the panel’s:
A field-installed neutral bar should not be created from a generic terminal block unless that component and mounting arrangement are approved for the assembly.
Only when the equipment application requires the neutral to be bonded to the enclosure.
Many convertible load centers are supplied with a green bonding screw or another bonding component. This allows the equipment to be configured for an approved service application where neutral-to-enclosure bonding is required.
In a downstream application, the bonding screw or strap normally remains uninstalled or is removed according to the manufacturer’s instructions.
The project should verify:
Do not determine the bonding arrangement from the color of one screw alone. The complete manufacturer instruction and equipment construction must be reviewed.
Only where the terminal and equipment are specifically identified for the conductors and application.
In a downstream panelboard, neutral conductors and equipment-grounding conductors serve different functions and should terminate on their respective bars.
Neutral conductors should terminate on the isolated neutral bar. Equipment-grounding conductors should terminate on the bonded ground bar.
Terminating a neutral and an equipment-grounding conductor under the same terminal in a downstream panel can:
Neutral terminals are commonly intended for one neutral conductor unless specifically identified otherwise. Ground-bar terminals may have different allowances, but the manufacturer’s terminal markings and instructions must control the installation.
The equipment-grounding bar in a metal downstream panelboard is normally bonded directly to the enclosure.
Approved construction may use:
The connection must provide reliable electrical continuity under normal and fault conditions.
Installing a ground bar on an insulated support or painted surface without the approved bonding method may leave the enclosure without an effective ground-fault current path.
No.
The ground bar should be installed using the hardware, location and method identified by the panel manufacturer.
A general-purpose screw may not provide:
Paint, powder coating and surface treatments can also interfere with electrical continuity. The approved mounting point may use prepared metal contact, thread-forming hardware or another evaluated bonding method.
Do not remove coating from random enclosure surfaces to create an improvised ground connection.
The panel layout must provide sufficient approved grounding terminals for the incoming feeder and outgoing circuits.
The ground-bar arrangement should account for:
Adding unapproved terminal blocks after the panel is manufactured can affect conductor routing, clearances and certification.
The equipment-grounding and bonding arrangement may need to connect multiple conductive parts, including:
Not every removable metal part automatically requires a separate bonding jumper. Suitability depends on the equipment construction, hinges, fasteners, installed devices and applicable product requirements.
For example, a plain metal door with no electrical devices may rely on the evaluated enclosure construction. A door carrying controls, meters, switches or energized equipment may require a defined bonding connection.
The manufacturer should confirm the approved assembly method rather than adding or omitting bonding jumpers based only on visual judgment.
A detached garage, workshop, pump house, utility building or similar structure requires more than a ground rod.
For a typical new feeder-supplied installation, the arrangement generally includes:
The grounding electrode system and feeder equipment grounding conductor perform different functions.
No, not in a typical new feeder installation.
A ground rod connects the structure to earth. It does not normally provide a sufficiently low-impedance fault-current path to operate the feeder overcurrent protective device quickly.
The equipment grounding conductor provides the metallic fault-current path back to the source bonding point.
A detached-building installation may therefore require both:
One does not automatically replace the other.
In a typical new installation supplied by a feeder containing an equipment grounding conductor, the neutral remains isolated at the detached-building panel.
The ground bar and enclosure are bonded to:
The neutral remains separate.
Older installations may have used the grounded conductor for certain grounding and bonding functions under previous code provisions and limited conditions. Such arrangements must be evaluated as existing installations under the locally adopted code. They should not be copied into new project specifications.
A transformer can establish a separately derived system when the derived circuit has no direct electrical connection to conductors of another system, other than permitted grounding and bonding connections.
A common example is a delta-to-wye transformer supplying:
The transformer secondary creates a new system neutral point. That system requires its own grounding and bonding arrangement in accordance with the applicable NEC rules.
For a grounded separately derived system, the system bonding jumper is installed at an approved location permitted by the applicable rules and equipment construction.
Depending on the design, it may be located:
The system bonding jumper should not be installed at multiple locations in a way that creates parallel neutral-current paths.
The grounding electrode conductor connection and system bonding arrangement must be coordinated. NFPA requirements for separately derived systems are primarily addressed in Article 250, including the rules associated with system bonding jumpers and grounding electrode connections.
After the transformer secondary bonding point has been established, downstream panelboards generally follow the same separation principle:
A transformer-fed panelboard is not automatically permitted to bond neutral and ground merely because the transformer is located nearby.
The one-line diagram must show:
A generator does not automatically require a second neutral-to-ground bond.
The correct arrangement depends heavily on whether the generator neutral remains electrically connected to the normal-source neutral.
The project must identify:
A generator is commonly treated as a separately derived system when the transfer equipment switches the neutral along with the ungrounded conductors, leaving no direct neutral connection to the normal source while the generator supplies the load.
In that arrangement, the generator system requires an appropriate system bonding and grounding electrode arrangement.
If the transfer switch leaves the neutral solidly connected between the utility and generator systems, the generator is commonly not treated as a separately derived system for this purpose. Adding another neutral-to-ground bond at the generator can then create a parallel neutral-current path.
This relationship is why generator bonding cannot be selected independently of the transfer switch.
A solid-neutral transfer switch switches the phase conductors while leaving the neutral continuously connected.
A switched-neutral transfer switch transfers the neutral together with the phase conductors.
| Transfer arrangement | Neutral condition | Typical bonding implication |
|---|---|---|
| Solid neutral | Utility and generator neutrals remain connected | Generator normally does not establish an additional bonding point |
| Switched neutral | Neutral is disconnected from one source and connected to the other | Generator may operate as a separately derived system requiring its own bonding arrangement |
This table is a general design guide, not a substitute for reviewing the actual transfer-switch operation.
Some transfer equipment may use:
Each configuration can affect the grounding, bonding and protection design.
Schneider Electric explains that transfer switches for separately derived generator systems can switch the neutral together with the phase conductors, while systems with a solidly connected neutral use a different grounding and bonding arrangement.
No.
An unnecessary generator neutral-to-frame bond may create parallel neutral-current paths when the generator neutral remains connected to the service neutral.
Removing a required bond can also prevent the intended ground-fault current path from operating correctly when the generator functions as a separately derived system.
The decision must be documented rather than improvised during installation.
The generator, transfer switch and downstream panelboards should be reviewed as one complete system.
Facilities may include:
The system can operate in several modes:
A bonding arrangement that is correct in one mode may create parallel paths or an ineffective fault-current path in another mode.
The engineering review should confirm:
The panel manufacturer should not infer these conditions from a simplified breaker schedule.
No.
An isolated-ground system does not authorize the neutral to be bonded in a downstream panel.
An isolated-ground conductor is an equipment grounding conductor arranged to reduce electrical noise on sensitive equipment. It may be insulated and routed so that it avoids selected intermediate enclosure connections before reaching the designated grounding point.
The system may include:
The metal panel enclosure must still have an effective equipment-grounding and bonding connection.
The isolated-ground conductor should not be used as:
The project drawings should clearly distinguish:
A general one-line diagram may not show every terminal, but it should provide enough information to establish the system grounding and bonding concept.
The drawing package should identify:
Panel fabrication drawings should additionally show:
Phrases such as “ground panel per code” are not sufficient for a complex multi-source project.
Neutral and ground errors are often hidden inside equipment that appears to operate normally.
A breaker may remain closed, connected loads may function, and no visible damage may occur. The error may only become apparent during inspection, ground-fault testing, generator commissioning or investigation of current on metal parts.
The following mistakes should be identified before the panel is manufactured or energized.
Neutral and ground should not be bonded simply because both bars are present in the same enclosure.
In a typical grounded system, the connection is established at the permitted system bonding point. Downstream panelboards normally keep the neutral isolated.
Adding another bond downstream can allow normal neutral current to divide among:
The correct approach is to identify the approved bonding point from the complete system design.
A main breaker provides a disconnecting and overcurrent-protection function. It does not prove that the panelboard is installed at the service point.
A main-breaker panel can be located:
A downstream main-breaker panel normally requires an isolated neutral in the same way as a downstream main-lug-only panel.
The RFQ and one-line diagram must state the equipment’s system position.
Convertible load centers may include a bonding screw or strap for service applications.
If the same equipment is used as a downstream panel, the bonding component may need to remain uninstalled or be removed according to the manufacturer’s instructions.
The assembly team should not assume that:
The panel may contain another strap, jumper or conductive mounting path. Final isolation should be verified using the approved construction and applicable test procedure.
A ground bar can be physically attached to an enclosure without providing a reliable electrical bond.
Potential problems include:
The approved ground-bar kit, mounting point and hardware should be used.
A continuity test may help verify the completed connection, but the test does not authorize an unapproved construction method.
A neutral conductor should not be moved to a ground bar merely because the neutral bar is full or difficult to reach.
This can create an unintended neutral-to-enclosure connection and place normal load current on bonded metal parts.
Insufficient neutral terminals should be addressed by:
An equipment-grounding terminal should not be used as an improvised neutral terminal.
A terminal should only contain the number, size, material and type of conductors for which it is identified.
Common errors include:
Overfilled terminals can produce loose connections, uneven clamping force and overheating.
The terminal markings and manufacturer instructions must control the final connection.
A grounding electrode at a detached building does not normally replace the equipment grounding conductor installed with the feeder.
The grounding electrode system connects the structure to earth. The equipment grounding conductor provides an effective metallic ground-fault current path back to the source bonding point.
A typical new detached-building installation can require both.
Providing only a ground rod may leave the fault-current path dependent on earth impedance, which may not allow the overcurrent protective device to operate as intended.
Generator bonding cannot be selected from the generator nameplate alone.
The engineering review must determine whether:
A correct generator bond used with the wrong transfer-switch configuration can become an incorrect system bond.
A transformer secondary may establish a separately derived system with an approved system bonding jumper at the transformer or another permitted location.
Adding another neutral-to-ground bond in the downstream panel can create a parallel path between the two bonding points.
The transformer, secondary disconnect and panelboard should be reviewed as a single system.
The drawings should clearly identify:
A resistance or continuity reading between neutral and ground does not automatically prove that they are bonded inside the panel being tested.
The reading may pass through:
Testing should follow a controlled procedure.
This may require:
Only qualified personnel should perform electrical testing.
Removing an extra downstream bond may be necessary, but removing the only required system bonding connection can create a different hazard.
Before altering any bond, confirm:
Corrective work should restore the approved system arrangement rather than simply eliminate every visible neutral-to-ground connection.
Field personnel may add or remove:
These changes can alter the grounding and bonding design without changing the equipment’s external appearance.
Every material field modification should be recorded and reviewed against:
An RFQ for a panelboard or subpanel should define the complete electrical system. A request stating only “provide a 200 A main-breaker panel” does not establish the correct neutral and ground arrangement.
The panel manufacturer needs to know where the equipment will operate and how it is supplied.
Provide:
The one-line diagram should identify the system bonding point rather than leaving it to the panel manufacturer to infer.
State:
A main-breaker or main-lug-only description is not a substitute for this information.
Where the panel is transformer supplied, provide:
The transformer secondary arrangement determines how the first panel and downstream panels should be configured.
Where an alternate source is included, provide:
Do not specify only “generator ready.” That phrase does not define the required bonding arrangement.
State:
The internal layout must provide adequate access to both neutral and ground terminals.
The specification should identify:
Do not assume that a standard neutral bar is suitable for every commercial or industrial load profile.
State:
If the equipment may be used in more than one system position, the final supplied configuration must be clearly documented.
Request:
The documentation package should show whether the panel is supplied as service equipment or downstream equipment.
The approved electrical design should be transferred into the panel construction before material purchasing and fabrication begin.
Confirm that:
The panel manufacturer should not select a bonding arrangement from a preliminary breaker schedule.
Confirm that:
Where nonlinear loads are significant, the engineer should confirm whether the neutral requires additional capacity.
Confirm that:
The design should distinguish equipment grounding from the grounding electrode system.
Confirm that:
A small bonding screw can determine whether the neutral is connected to the entire enclosure. Its status should not be left undocumented.
Confirm that the enclosure provides:
The internal layout should prevent neutral and ground conductors from being crossed merely to reach poorly positioned terminals.
Confirm that:
Physical fit alone does not prove that a neutral or ground accessory is suitable for the panelboard.
Factory assembly should reproduce the approved system design.
Verify:
The inspection should identify unauthorized drilled holes, replacement screws or improvised bonding connections.
Verify:
Wire routing should allow inspection without unnecessary disassembly.
Terminals and bonding connections should be tightened to the applicable manufacturer values using controlled tools and procedures.
Verify:
The torque record should identify the applicable value, tool and inspection status.
Depending on the equipment and production scope, factory checks may include:
Test results must be interpreted according to the equipment state.
Connected surge devices, control transformers, filters or other components may affect measured resistance. The test procedure should define which conductors or components must be disconnected.
Verify that the completed equipment includes the required:
A generic “grounded panel” label does not adequately describe the system bonding arrangement.
A correctly manufactured panel can be installed incorrectly.
Site work may change:
The installed condition must be compared with the approved design.
Confirm:
A four-wire feeder should not be converted into a three-wire arrangement in the field merely because the grounding conductor was omitted from the purchase.
Confirm:
The panel should be inspected before the deadfront is installed and again before energization.
Where a grounding electrode system is required, confirm:
Grounding electrode resistance alone does not confirm the effectiveness of the equipment-grounding path.
Confirm:
Commissioning should test all applicable source configurations, not only normal utility operation.
Before energization, compare the actual installation with the approved one-line diagram and panel drawings.
Verify:
If the source, transfer equipment or feeder arrangement differs from the approved design, the grounding and bonding system should be re-evaluated before energization.
Re-evaluation may be necessary after:
The grounding and bonding system remains correct only while the installed equipment and operating modes match the verified design.
E-abel is a Foshan manufacturer of IEC/ANSI metal electrical enclosures and turnkey complete electrical panel assemblies.
Through its ONE-STOP DATA TO PANEL SOLUTION, E-abel supports projects from customer electrical data and enclosure engineering through manufacturing, assembly and testing.
For panelboard, load-center, switchboard and industrial power-distribution projects involving neutral and ground separation, E-abel can support:
E-abel can manufacture the panel according to the approved system design, device schedule and drawings.
However, the responsible project engineer must define and approve:
Final installation and acceptance also depend on the licensed electrical contractor, engineer of record, project specification, equipment instructions and authority having jurisdiction.
The objective is to convert an approved grounding and bonding design into a controlled, traceable complete-panel assembly. The panel manufacturer should not independently guess where the neutral-to-ground bond belongs.
The project team should provide, where applicable:
E-abel can then develop or review panel construction details such as:
Missing system information should be resolved before production begins.
Depending on the approved equipment design and project scope, factory verification may include:
These checks confirm the panel’s manufactured condition.
They do not determine whether the site has the correct service bond, grounding electrode system, generator-neutral arrangement or feeder grounding conductor. Those conditions must be verified as part of the complete installation.
Neutral and ground perform different functions.
The neutral carries normal current from line-to-neutral loads. The equipment grounding and bonding system provides a path for ground-fault current and connects exposed conductive parts.
For a typical grounded utility-supplied system:
For a separately derived system:
For generator systems:
The essential conclusions are:
The correct arrangement is based on the complete electrical system—not on the panel name, breaker size or appearance.
Before ordering, manufacturing or energizing a panelboard, confirm:
Normally, no.
In a typical grounded system, a downstream panelboard keeps the neutral isolated from the enclosure and equipment-grounding system. The equipment-grounding bar is bonded to the enclosure and connected to the upstream grounding and bonding system through the feeder equipment grounding conductor.
Bonding neutral and ground again in the subpanel can create parallel paths for normal neutral current.
The final arrangement must still be verified against the actual source, system design, locally adopted code and manufacturer instructions.
No, not merely because it contains a main breaker.
A main breaker provides local disconnecting and overcurrent protection. It does not establish the panel as service equipment.
If the main-breaker panel is installed downstream from the permitted bonding point, the neutral normally remains isolated and the ground bar remains bonded to the enclosure.
The project must identify whether the breaker is the service disconnect or simply a downstream main device.
A typical metal downstream panel requires an approved equipment-grounding terminal bar or bus that is bonded to the enclosure and separate from the isolated neutral assembly.
The ground bar must provide suitable terminals for:
The exact ground-bar kit, terminal quantity, conductor range and mounting method must match the panel manufacturer’s instructions.
Normally, no.
Ground rods and other grounding electrodes connect the detached structure to earth. The feeder equipment grounding conductor provides an effective metallic path for ground-fault current to return to the source bonding point.
A typical new detached-building installation may require both:
Older installations may require case-specific evaluation under the locally adopted code, but legacy arrangements should not be used as the default design for new projects.
It depends on the generator and transfer-system configuration.
If the generator neutral remains solidly connected to the service neutral through the transfer equipment, the generator is commonly not treated as a separately derived system for this purpose. An additional generator neutral-to-ground bond can create a parallel current path.
If the transfer equipment switches the neutral, the generator may operate as a separately derived system and require an appropriate system bonding and grounding electrode arrangement.
The generator bond should not be installed or removed until the following have been confirmed:
Always verify the locally adopted NEC edition, project specifications, approved one-line diagram, equipment instructions and authority-having-jurisdiction requirements before manufacturing or modifying an electrical panel.